Welcome to the Kurt J. Lesker Company.  

Sign In | Register

Current Region: International (Change) | Contact Us |   RSS   Twitter   LinkedIn   YouTube

Close

Please select your country or region to be
directed to the appropriate Lesker site.

Liquid/Gas Fluid Feedthrough Configurator


Dimensional Drawings


Feedthrough Selection Guide
Finding the right feedthrough has never been easier with our step by step Feedthrough Selection Guide.
Contact Us
To speak with someone directly, please call +1 412 387 9200 or email international@lesker.com.

Start Your Configuration

1. Feedthrough Type:
2. Mounting Flange:
3. No. of Tubes:
4. Tube OD:
5. Vacuum-Side Terminations:
6. Air-Side Terminations: